Universitas Stikubank (Unisbank) Semarang Repository

USULAN PERBAIKAN TATA LETAK LINE SEWING PADA PT BINA BUSANA INTERNUSA SEMARANG DENGAN METODE SYSTEMATIC LAYOUT PLANNING (SLP)

Hutagaol, Haryanto.T. (2020) USULAN PERBAIKAN TATA LETAK LINE SEWING PADA PT BINA BUSANA INTERNUSA SEMARANG DENGAN METODE SYSTEMATIC LAYOUT PLANNING (SLP). Undergraduate thesis, Universitas Stikubank.

[thumbnail of HALAMAN JUDUL] PDF (HALAMAN JUDUL)
Download (394kB)
[thumbnail of ABSTRAK] PDF (ABSTRAK)
Download (211kB)
[thumbnail of BAB I] PDF (BAB I)
Download (299kB)
[thumbnail of BAB II] PDF (BAB II)
Restricted to Repository staff only

Download (614kB)
[thumbnail of BAB III] PDF (BAB III)
Restricted to Repository staff only

Download (194kB)
[thumbnail of BAB IV] PDF (BAB IV)
Restricted to Repository staff only

Download (478kB)
[thumbnail of BAB V] PDF (BAB V)
Restricted to Repository staff only

Download (1MB)
[thumbnail of BAB VI] PDF (BAB VI)
Restricted to Repository staff only

Download (153kB)
[thumbnail of DAFTAR PUSTAKA] PDF (DAFTAR PUSTAKA)
Download (149kB)
[thumbnail of LAMPIRAN] PDF (LAMPIRAN)
Restricted to Repository staff only

Download (885kB)

Abstract

Pada perusahaan manufaktur, efisiensi merupakan bagian yang mempunyai peranan sangat penting. Salah satunya efisiensi pada tata letak fasilitas produksi. Dengan tata letak fasilitas produksi yang tepat maka akan meningkatkan efisiensi lini produksi yang akan berdampak pada meningkatnya produksitivitas perusahaan. PT. Bina Busana Internusa Semarang merupakan salah satu perusahaan manufaktur yang bergerak pada bidang garment ( pakaian jadi). Dengan bahan baku kain. Permasalahan yang terjadi adalah tata letak fasilitas produksi yang tidak tepat dan jarak fasilitas produksi berjauhan sehingga memperbesar waktuan proses produksi . Tahapan yang dilakukan pada penelitian ini adalah observasi awal, identifikasi masalah, perumusan masalah, tujuan penelitian, pembatasan masalah, asumsi, studi literatur, pengumpulan dan pengolahan data, analisis data serta kesimpulan dan saran. Pada penelitian ini menerapkan metode Systematic Layout Planning (SLP) dan menggunakan perhitungan Total Momen Awal VS Total Momen Usulan. Dari penelitian ini dapat disimpulkan bahwa dengan menerapkan layout usulan dengan metode Systematic Layout Planning (SLP) dan menggunakan perhitungan Total Momen Awal VS Total Momen Usulan lebih efisien dibandingkan layout yang digunakan oleh perusahaan saat ini. Dengan metode ini, efisiensi jarak produksi produk Pakaian Dokter meningkat sebesar 70%. In manufacturing companies, efficiency is a part that has a very important role. One of them is the efficiency in the layout of the production facility. With the correct layout of production facilities, it will increase the efficiency of the production line which will have an impact on increasing the company's productivity. PT. Bina Busana Internusa Semarang is a manufacturing company engaged in garment (apparel). With fabric raw materials. The problem that occurs is the improper layout of the production facilities and the distance between the production facilities, thus increasing the production process time. The stages carried out in this study are initial observation, problem identification, problem formulation, research objectives, problem limitation, assumptions, literature study, data collection and processing, data analysis and conclusions and suggestions. This research applies the Systematic Layout Planning (SLP) method and uses the calculation of Total Initial Moments VS Total Proposed Moments. From this study it can be concluded that applying the proposed layout with the Systematic Layout Planning (SLP) method and using the calculation of Total Initial Moments VS Total Proposed Moments is more efficient than the layout used by the company today. With this method, the production distance efficiency of Doctor's Clothes products increases by 70%.

Item Type: Thesis (Undergraduate)
Additional Information: SKR.IV.04.51.0321 NIM 17.04.61.0003
Uncontrolled Keywords: Keywords : effisiensi, tata letak produksi, jarak fasiltas, sysmatic layout planning, total momen awal, total momen usulan
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Faculty / Institution: Fakultas Teknik
Depositing User: Lisa Noviani Maghfiroh
Date Deposited: 11 Nov 2020 02:05
Last Modified: 11 Nov 2020 02:05
URI: https://eprints.unisbank.ac.id/id/eprint/7454

Actions (login required)

View Item View Item